Renewable sites › Hywind 2
Hywind 2
Hywind 2 is an operational 1 MW battery storage site in Aberdeenshire, generating since 20 November 2018. REPD does not record the planning grant date. Operator of record: Statoil.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 20 November 2018 |
Screening a site of your own?
Aberdeenshire approves 96% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Hywind 2’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on battery storage
Aberdeenshire has decided 27 battery storage schemes and approved 96%, taking a median of 5.7 months. See every battery storage scheme decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 2 | 5.4 km |
Battery · Under Construction | — | 6.2 km |
Solar Photovoltaics · Under Construction | 14.2 | 6.2 km |
Wind Onshore · Under Construction | 3 | 6.5 km |
Battery · Under Construction | — | 6.5 km |
Solar Photovoltaics · Under Construction | 5 | 6.5 km |
Landfill Gas · Operational | 4.3 | 7.1 km |
Wind Onshore · Operational | 6 | 9.4 km |
How big is Hywind 2?
Hywind 2 has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hywind 2?
REPD records the operator as Statoil. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hywind 2 approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 20 November 2018.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6884.