Novarly ParcelRenewable sites

Renewable sitesBalmcassie Commercial Park - Anaerobic digestion plant

Balmcassie Commercial Park - Anaerobic digestion plant

Balmcassie Commercial Park - Anaerobic digestion plant is a 3.5 MW anaerobic digestion plant under construction in Aberdeenshire. REPD does not record the planning grant date. Operator of record: Brewdog Limited.

3.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
Brewdog Limited
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted5 August 2020
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Aberdeenshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Balmcassie Commercial Park - Anaerobic digestion plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.44 km
Battery · Under Construction
6.5 km
Solar Photovoltaics · Under Construction
216.5 km
Wind Onshore · Operational
6.97.6 km
Wind Onshore · Operational
19.3 km
Wind Onshore · Operational
3.210.1 km
Wind Onshore · Operational
6.911.5 km
Wind Onshore · Operational
2.312.9 km

How big is Balmcassie Commercial Park - Anaerobic digestion plant?

Balmcassie Commercial Park - Anaerobic digestion plant has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Balmcassie Commercial Park - Anaerobic digestion plant?

REPD records the operator as Brewdog Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Balmcassie Commercial Park - Anaerobic digestion plant approved and built?

The application was submitted on 5 August 2020. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11248.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode