Upper Ardgrain Wind Farm is an operational 2.4 MW onshore wind farm in Aberdeenshire, generating since 1 October 2010. Planning permission was granted on 27 April 2010, 29 months after submission. Operator of record: Green Cat Renewables.

2.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2010
Wind Onshore
Technology
Green Cat Renewables
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted20 November 2007
Permission granted27 April 2010
29 months after submission
Operational1 October 2010
5 months after consent

Screening a site of your own?

RedlineUK · £39

Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Upper Ardgrain Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Under Construction
3.54 km
Wind Onshore · Operational
17.6 km
Wind Onshore · Operational
3.28 km
Wind Onshore · Operational
6.98.2 km
Wind Onshore · Operational
2.49.9 km
Battery · Under Construction
10.4 km
Solar Photovoltaics · Under Construction
2110.4 km
Wind Onshore · Operational
6.911 km

How big is Upper Ardgrain Wind Farm?

Upper Ardgrain Wind Farm has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Upper Ardgrain Wind Farm?

REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Upper Ardgrain Wind Farm approved and built?

The application was submitted on 20 November 2007. Permission was granted on 27 April 2010, 29 months later. The site became operational on 1 October 2010, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3524.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode