Stoneyhill Landfill Site
Stoneyhill Landfill Site is an operational 4.3 MW landfill gas site in Aberdeenshire, generating since 1 April 2005. Planning permission was granted on 3 March 2005, 9 months after submission. Operator of record: Stoneyhill Waste Management Ltd.
Planning and build timeline
| Application submitted | 4 June 2004 |
| Permission granted | 3 March 2005 9 months after submission |
| Operational | 1 April 2005 1 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Aberdeenshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Stoneyhill Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 14.2 | 1.1 km |
Battery · Under Construction | — | 1.1 km |
Wind Onshore · Operational | 1 | 5.2 km |
Battery · Operational | 1 | 7.1 km |
Wind Onshore · Operational | 2.4 | 10 km |
Solar Photovoltaics · Under Construction | 2 | 10.2 km |
Solar Photovoltaics · Under Construction | 5 | 12 km |
Wind Onshore · Under Construction | 3 | 12 km |
How big is Stoneyhill Landfill Site?
Stoneyhill Landfill Site has a recorded installed capacity of 4.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stoneyhill Landfill Site?
REPD records the operator as Stoneyhill Waste Management Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stoneyhill Landfill Site approved and built?
The application was submitted on 4 June 2004. Permission was granted on 3 March 2005, 9 months later. The site became operational on 1 April 2005, 1 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 788.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode