Wothersome Grange Farm House AD - crops
Wothersome Grange Farm House AD - crops is operational in Leeds with a recorded capacity of 1 MW, and has been generating since 2015-12-03.
Planning and build timeline
| Application submitted | 2013-11-07 |
| Permission granted | 2013-12-23 2 months after submission |
| Operational | 2015-12-03 23 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Leeds
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hook Moor Wind Onshore · Operational | 10.3 | 8.2 km |
Peckfield Quarry Landfill Scheme Landfill Gas · Operational | 3.9 | 11.1 km |
Buslingthorpe Power Station (Leeds North) Biomass (dedicated) · Operational | 2 | 12 km |
Cross Green ERF EfW Incineration · Operational | 11.6 | 12.2 km |
Regent Street, Sheepscar - Solar Panels Solar Photovoltaics · Operational | 0.22 | 12.3 km |
Skelton Grange Landfill Landfill Gas · Operational | 5.2 | 12.3 km |
Knostrop Sewage Treatment Works Anaerobic Digestion · Operational | 4 | 12.4 km |
Skelton Grange � Energy Recovery Facility EfW Incineration · Under Construction | 49 | 13.1 km |
How big is Wothersome Grange Farm House AD - crops?
Wothersome Grange Farm House AD - crops has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wothersome Grange Farm House AD - crops?
REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wothersome Grange Farm House AD - crops approved and built?
The application was submitted on 2013-11-07. Permission was granted on 2013-12-23, 2 months later. The site became operational on 2015-12-03, 23 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 381.
Novarly Parcel · official public data, read properly · parcel.novarly.com