Novarly ParcelRenewable sites

Renewable sitesWothersome Grange Farm House AD - crops

Wothersome Grange Farm House AD - crops

Wothersome Grange Farm House AD - crops is an operational 1 MW anaerobic digestion plant in Leeds, generating since 3 December 2015. Planning permission was granted on 23 December 2013, 2 months after submission. Operator of record: Private Developer.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 3 December 2015
Anaerobic Digestion
Technology
Private Developer
Leeds
Authority
England

Planning and build timeline

Application submitted7 November 2013
Permission granted23 December 2013
2 months after submission
Operational3 December 2015
23 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Leeds: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wothersome Grange Farm House AD - crops’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
10.38.2 km
Landfill Gas · Operational
3.911.1 km
Biomass (dedicated) · Operational
212 km
EfW Incineration · Operational
11.612.2 km
Solar Photovoltaics · Operational
0.2212.3 km
Landfill Gas · Operational
5.212.3 km
Anaerobic Digestion · Operational
412.4 km
EfW Incineration · Under Construction
4913.1 km

How big is Wothersome Grange Farm House AD - crops?

Wothersome Grange Farm House AD - crops has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wothersome Grange Farm House AD - crops?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wothersome Grange Farm House AD - crops approved and built?

The application was submitted on 7 November 2013. Permission was granted on 23 December 2013, 2 months later. The site became operational on 3 December 2015, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 381.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode