Novarly ParcelRenewable sites

Renewable sitesHook Moor

Hook Moor

Hook Moor is an operational 10.3 MW onshore wind farm in Leeds, generating since 15 January 2016. Planning permission was granted on 9 December 2011, 45 months after submission. Operator of record: Banks Renewables.

10.3 MW
Capacity
as recorded in REPD
Operational
Status
since 15 January 2016
Wind Onshore
Technology
Banks Renewables
Leeds
Authority
England

Planning and build timeline

Application submitted26 February 2008
Permission granted9 December 2011
45 months after submission
Operational15 January 2016
49 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Leeds: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hook Moor’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
3.93.3 km
Solar Photovoltaics · Under Construction
406.4 km
Solar Photovoltaics · Operational
57.5 km
Solar Photovoltaics · Under Construction
0.657.8 km
Battery · Under Construction
3207.9 km
Battery · Under Construction
577.9 km
Solar Photovoltaics · Operational
58 km
Anaerobic Digestion · Operational
18.2 km

How big is Hook Moor?

Hook Moor has a recorded installed capacity of 10.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hook Moor?

REPD records the operator as Banks Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hook Moor approved and built?

The application was submitted on 26 February 2008. Permission was granted on 9 December 2011, 45 months later. The site became operational on 15 January 2016, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4658.