Novarly ParcelRenewable sites

Renewable sitesBuslingthorpe Power Station (Leeds North)

Buslingthorpe Power Station (Leeds North)

Buslingthorpe Power Station (Leeds North) is operational in Leeds with a recorded capacity of 2 MW, and has been generating since 2011-10-14.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-10-14
Biomass (dedicated)
Technology
Living Power (REG Bio-Power)
Leeds
Authority
England

Planning and build timeline

Application submitted2010-09-30
Permission granted2010-12-30
3 months after submission
Operational2011-10-14
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Regent Street, Sheepscar - Solar Panels
Solar Photovoltaics · Operational
0.221.4 km
TF and JH Braime Holdings Factory
Solar Photovoltaics · Operational
0.23 km
LVF Packaging - Solar Panel
Solar Photovoltaics · Operational
0.33.6 km
Cross Green ERF
EfW Incineration · Operational
11.63.9 km
Knostrop WWTW AD
Anaerobic Digestion · Operational
2.44.5 km
Knostrop Sewage Treatment Works
Anaerobic Digestion · Operational
45 km
Skelton Grange � Energy Recovery Facility
EfW Incineration · Under Construction
495.2 km
Skelton Grange Landfill
Landfill Gas · Operational
5.28 km

How big is Buslingthorpe Power Station (Leeds North)?

Buslingthorpe Power Station (Leeds North) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Buslingthorpe Power Station (Leeds North)?

REPD records the operator as Living Power (REG Bio-Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Buslingthorpe Power Station (Leeds North) approved and built?

The application was submitted on 2010-09-30. Permission was granted on 2010-12-30, 3 months later. The site became operational on 2011-10-14, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 26.