Renewable sitesSkelton Grange Landfill

Skelton Grange Landfill

Skelton Grange Landfill is operational in Leeds with a recorded capacity of 5.2 MW, and has been generating since 2007-05-01.

5.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-05-01
Landfill Gas
Technology
Biffa
Leeds
Authority
England

Planning and build timeline

Application submitted2004-12-16
Permission granted2005-03-17
3 months after submission
Operational2007-05-01
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Knostrop Sewage Treatment Works
Anaerobic Digestion · Operational
43.2 km
Skelton Grange � Energy Recovery Facility
EfW Incineration · Under Construction
493.5 km
Knostrop WWTW AD
Anaerobic Digestion · Operational
2.44.2 km
Cross Green ERF
EfW Incineration · Operational
11.64.3 km
LVF Packaging - Solar Panel
Solar Photovoltaics · Operational
0.35.4 km
Barnsdale Road Solar Park
Solar Photovoltaics · Under Construction
405.6 km
TF and JH Braime Holdings Factory
Solar Photovoltaics · Operational
0.26 km
Regent Street, Sheepscar - Solar Panels
Solar Photovoltaics · Operational
0.226.8 km

How big is Skelton Grange Landfill?

Skelton Grange Landfill has a recorded installed capacity of 5.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Skelton Grange Landfill?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Skelton Grange Landfill approved and built?

The application was submitted on 2004-12-16. Permission was granted on 2005-03-17, 3 months later. The site became operational on 2007-05-01, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 680.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council