Planning and build timeline
| Application submitted | 2021-03-10 |
| Permission granted | 2021-07-09 4 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Lincolnshire’s record on solar
North Lincolnshire has decided 28 solar farms and approved 89%, taking a median of 1.8 months. See every solar farm decision in North Lincolnshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Winterton Landfill Site Landfill Gas · Operational | 3.8 | 1.2 km |
Roxby Gas to Energy Landfill Gas · Operational | 8.5 | 3.8 km |
Bagmoor Wind Onshore · Operational | 16 | 5.8 km |
Grange Wind Onshore · Operational | 12.3 | 6.2 km |
Flixborough Industrial Estate Solar Photovoltaics · Operational | 5 | 7.4 km |
Melton Common Wind Cluster Wind Onshore · Operational | 5 | 7.5 km |
Melton Waste Park Wind Onshore · Operational | 5 | 8 km |
Keadby Wind Farm Wind Onshore · Operational | 68 | 11.2 km |
How big is Winterton Landfill Site - Ground Mounted Solar PV Arrays?
Winterton Landfill Site - Ground Mounted Solar PV Arrays has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Winterton Landfill Site - Ground Mounted Solar PV Arrays?
REPD records the operator as Infinis Solar Developments Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Winterton Landfill Site - Ground Mounted Solar PV Arrays approved and built?
The application was submitted on 2021-03-10. Permission was granted on 2021-07-09, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8857.
Novarly Parcel · official public data, read properly · parcel.novarly.com