Keadby Wind Farm is operational in North Lincolnshire with a recorded capacity of 68 MW, and has been generating since 2015-02-26.
Planning and build timeline
| Application submitted | 2003-10-24 |
| Permission granted | 2008-02-28 52 months after submission |
| Operational | 2015-02-26 84 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Lincolnshire’s record on onshore wind
North Lincolnshire has decided 8 onshore wind schemes and approved 38%, taking a median of 14.6 months. See every onshore wind scheme decision in North Lincolnshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
North Moor Farm AD Plant (Farm AD) Anaerobic Digestion · Operational | 4 | 4.6 km |
Flixborough Industrial Estate Solar Photovoltaics · Operational | 5 | 4.7 km |
Grange Wind Onshore · Operational | 12.3 | 5.1 km |
Bagmoor Wind Onshore · Operational | 16 | 6.6 km |
Twin Rivers Wind Onshore · Operational | 28.7 | 9.4 km |
Roxby Gas to Energy Landfill Gas · Operational | 8.5 | 9.8 km |
Goole Fields Wind Onshore · Operational | 32.8 | 10.3 km |
Goole Fields ll Wind Farm Wind Onshore · Operational | 34.9 | 10.9 km |
How big is Keadby Wind Farm?
Keadby Wind Farm has a recorded installed capacity of 68 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Keadby Wind Farm?
REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Keadby Wind Farm approved and built?
The application was submitted on 2003-10-24. Permission was granted on 2008-02-28, 52 months later. The site became operational on 2015-02-26, 84 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4260.