Renewable sites › Flixborough Industrial Estate
Flixborough Industrial Estate
Flixborough Industrial Estate is an operational 5 MW solar farm in North Lincolnshire, generating since 1 March 2017. Planning permission was granted on 11 October 2016, 18 months after submission. Operator of record: NESF (formerly INRG Solar).
Planning and build timeline
| Application submitted | 8 April 2015 |
| Permission granted | 11 October 2016 18 months after submission |
| Operational | 1 March 2017 5 months after consent |
Screening a site of your own?
North Lincolnshire approves 89% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Flixborough Industrial Estate’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Lincolnshire’s record on solar
North Lincolnshire has decided 28 solar farms and approved 89%, taking a median of 1.8 months. See every solar farm decision in North Lincolnshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 16 | 2 km |
Wind Onshore · Operational | 12.3 | 2 km |
Wind Onshore · Operational | 68 | 4.7 km |
Landfill Gas · Operational | 8.5 | 5.2 km |
Solar Photovoltaics · Under Construction | 5 | 7.4 km |
Landfill Gas · Operational | 3.8 | 7.5 km |
Anaerobic Digestion · Operational | 4 | 8.3 km |
Solar Photovoltaics · Operational | 38 | 10 km |
How big is Flixborough Industrial Estate?
Flixborough Industrial Estate has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Flixborough Industrial Estate?
REPD records the operator as NESF (formerly INRG Solar). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Flixborough Industrial Estate approved and built?
The application was submitted on 8 April 2015. Permission was granted on 11 October 2016, 18 months later. The site became operational on 1 March 2017, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5204.