Flixborough Industrial Estate is operational in North Lincolnshire with a recorded capacity of 5 MW, and has been generating since 2017-03-01.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-01
Solar Photovoltaics
Technology
NESF (formerly INRG Solar)
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted2015-04-08
Permission granted2016-10-11
18 months after submission
Operational2017-03-01
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Lincolnshire’s record on solar

North Lincolnshire has decided 28 solar farms and approved 89%, taking a median of 1.8 months. See every solar farm decision in North Lincolnshire

Other built sites within 15 km

SiteMWDistance
Bagmoor
Wind Onshore · Operational
162 km
Grange
Wind Onshore · Operational
12.32 km
Keadby Wind Farm
Wind Onshore · Operational
684.7 km
Roxby Gas to Energy
Landfill Gas · Operational
8.55.2 km
Winterton Landfill Site - Ground Mounted Solar PV Arrays
Solar Photovoltaics · Under Construction
57.4 km
Winterton Landfill Site
Landfill Gas · Operational
3.87.5 km
North Moor Farm AD Plant (Farm AD)
Anaerobic Digestion · Operational
48.3 km
Raventhorpe Farm
Solar Photovoltaics · Operational
3810 km

How big is Flixborough Industrial Estate?

Flixborough Industrial Estate has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Flixborough Industrial Estate?

REPD records the operator as NESF (formerly INRG Solar). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Flixborough Industrial Estate approved and built?

The application was submitted on 2015-04-08. Permission was granted on 2016-10-11, 18 months later. The site became operational on 2017-03-01, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5204.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council