Renewable sites › Roxby Gas to Energy
Roxby Gas to Energy
Roxby Gas to Energy is operational in North Lincolnshire with a recorded capacity of 8.5 MW, and has been generating since 2004-04-01.
Planning and build timeline
| Application submitted | 1996-12-01 |
| Permission granted | not recorded |
| Operational | 2004-04-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Winterton Landfill Site Landfill Gas · Operational | 3.8 | 3.1 km |
Bagmoor Wind Onshore · Operational | 16 | 3.2 km |
Winterton Landfill Site - Ground Mounted Solar PV Arrays Solar Photovoltaics · Under Construction | 5 | 3.8 km |
Grange Wind Onshore · Operational | 12.3 | 5 km |
Flixborough Industrial Estate Solar Photovoltaics · Operational | 5 | 5.2 km |
Raventhorpe Farm Solar Photovoltaics · Operational | 38 | 9.5 km |
Keadby Wind Farm Wind Onshore · Operational | 68 | 9.8 km |
Melton Common Wind Cluster Wind Onshore · Operational | 5 | 9.9 km |
How big is Roxby Gas to Energy?
Roxby Gas to Energy has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Roxby Gas to Energy?
REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Roxby Gas to Energy approved and built?
The application was submitted on 1996-12-01. REPD does not record a grant date. The site became operational on 2004-04-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 623.