Renewable sites › Roxby Gas to Energy
Roxby Gas to Energy
Roxby Gas to Energy is an operational 8.5 MW landfill gas site in North Lincolnshire, generating since 1 April 2004. REPD does not record the planning grant date. Operator of record: Biffa.
Planning and build timeline
| Application submitted | 1 December 1996 |
| Permission granted | not recorded |
| Operational | 1 April 2004 |
Screening a site of your own?
Redline runs the record on your own boundary in North Lincolnshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Roxby Gas to Energy’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 3.8 | 3.1 km |
Wind Onshore · Operational | 16 | 3.2 km |
Solar Photovoltaics · Under Construction | 5 | 3.8 km |
Wind Onshore · Operational | 12.3 | 5 km |
Solar Photovoltaics · Operational | 5 | 5.2 km |
Solar Photovoltaics · Operational | 38 | 9.5 km |
Wind Onshore · Operational | 68 | 9.8 km |
Wind Onshore · Operational | 5 | 9.9 km |
How big is Roxby Gas to Energy?
Roxby Gas to Energy has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Roxby Gas to Energy?
REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Roxby Gas to Energy approved and built?
The application was submitted on 1 December 1996. REPD does not record a grant date. The site became operational on 1 April 2004.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 623.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode