Roxby Gas to Energy

Roxby Gas to Energy is operational in North Lincolnshire with a recorded capacity of 8.5 MW, and has been generating since 2004-04-01.

8.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-04-01
Landfill Gas
Technology
Biffa
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted1996-12-01
Permission grantednot recorded
Operational2004-04-01

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Winterton Landfill Site
Landfill Gas · Operational
3.83.1 km
Bagmoor
Wind Onshore · Operational
163.2 km
Winterton Landfill Site - Ground Mounted Solar PV Arrays
Solar Photovoltaics · Under Construction
53.8 km
Grange
Wind Onshore · Operational
12.35 km
Flixborough Industrial Estate
Solar Photovoltaics · Operational
55.2 km
Raventhorpe Farm
Solar Photovoltaics · Operational
389.5 km
Keadby Wind Farm
Wind Onshore · Operational
689.8 km
Melton Common Wind Cluster
Wind Onshore · Operational
59.9 km

How big is Roxby Gas to Energy?

Roxby Gas to Energy has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Roxby Gas to Energy?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Roxby Gas to Energy approved and built?

The application was submitted on 1996-12-01. REPD does not record a grant date. The site became operational on 2004-04-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 623.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council