Novarly ParcelRenewable sites

Renewable sitesRoxby Gas to Energy

Roxby Gas to Energy

Roxby Gas to Energy is an operational 8.5 MW landfill gas site in North Lincolnshire, generating since 1 April 2004. REPD does not record the planning grant date. Operator of record: Biffa.

8.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2004
Landfill Gas
Technology
Biffa
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted1 December 1996
Permission grantednot recorded
Operational1 April 2004

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Lincolnshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Roxby Gas to Energy’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
3.83.1 km
Wind Onshore · Operational
163.2 km
Solar Photovoltaics · Under Construction
53.8 km
Wind Onshore · Operational
12.35 km
Solar Photovoltaics · Operational
55.2 km
Solar Photovoltaics · Operational
389.5 km
Wind Onshore · Operational
689.8 km
Wind Onshore · Operational
59.9 km

How big is Roxby Gas to Energy?

Roxby Gas to Energy has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Roxby Gas to Energy?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Roxby Gas to Energy approved and built?

The application was submitted on 1 December 1996. REPD does not record a grant date. The site became operational on 1 April 2004.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 623.