Winterton Landfill Site

Winterton Landfill Site is an operational 3.8 MW landfill gas site in North Lincolnshire, generating since 1 July 1996. Planning permission was granted on 2 June 1994, 3 months after submission. Operator of record: Humberside Wastewise Ltd / Coal Products Limited.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 1996
Landfill Gas
Technology
Humberside Wastewise Ltd / Coal Products Limited
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted14 March 1994
Permission granted2 June 1994
3 months after submission
Operational1 July 1996
25 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Lincolnshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Winterton Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
51.2 km
Landfill Gas · Operational
8.53.1 km
Wind Onshore · Operational
165.7 km
Wind Onshore · Operational
12.36.5 km
Wind Onshore · Operational
57.2 km
Solar Photovoltaics · Operational
57.5 km
Wind Onshore · Operational
57.7 km
Anaerobic Digestion · Operational
1.510.8 km

How big is Winterton Landfill Site?

Winterton Landfill Site has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Winterton Landfill Site?

REPD records the operator as Humberside Wastewise Ltd / Coal Products Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Winterton Landfill Site approved and built?

The application was submitted on 14 March 1994. Permission was granted on 2 June 1994, 3 months later. The site became operational on 1 July 1996, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 625.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode