Renewable sites › Melton Common Wind Cluster
Melton Common Wind Cluster
Melton Common Wind Cluster is operational in East Riding of Yorkshire with a recorded capacity of 5 MW, and has been generating since 2017-03-01.
Planning and build timeline
| Application submitted | 2013-06-14 |
| Permission granted | 2013-12-19 6 months after submission |
| Operational | 2017-03-01 38 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Riding of Yorkshire’s record on onshore wind
East Riding of Yorkshire has decided 55 onshore wind schemes and approved 82%, taking a median of 7.8 months. See every onshore wind scheme decision in East Riding of Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Melton Waste Park Wind Onshore · Operational | 5 | 0.5 km |
Winterton Landfill Site Landfill Gas · Operational | 3.8 | 7.2 km |
Winterton Landfill Site - Ground Mounted Solar PV Arrays Solar Photovoltaics · Under Construction | 5 | 7.5 km |
Cottingham - Solar Farm Solar Photovoltaics · Operational | 5 | 8.6 km |
Roxby Gas to Energy Landfill Gas · Operational | 8.5 | 9.9 km |
Bonby Lane Anaerobic Digestion · Operational | 1.5 | 10.1 km |
Brocklesby - Crosslands Lane Anaerobic Digestion · Operational | 3.5 | 10.9 km |
Creyke Beck Battery · Operational | 49.9 | 12.1 km |
How big is Melton Common Wind Cluster?
Melton Common Wind Cluster has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Melton Common Wind Cluster?
REPD records the operator as Seneca Global Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Melton Common Wind Cluster approved and built?
The application was submitted on 2013-06-14. Permission was granted on 2013-12-19, 6 months later. The site became operational on 2017-03-01, 38 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3645.
Novarly Parcel · official public data, read properly · parcel.novarly.com