Bonby Lane is operational in North Lincolnshire with a recorded capacity of 1.5 MW, and has been generating since 2018-06-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-06-01
Anaerobic Digestion
Technology
Zebec Energy
North Lincolnshire
Authority
England

Planning and build timeline

Application submitted2014-10-06
Permission granted2015-11-18
13 months after submission
Operational2018-06-01
30 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Melton Ross
Advanced Conversion Technologies · Operational
5.88.7 km
Singleton Birch (Farm AD)
Anaerobic Digestion · Operational
1.58.7 km
Atherton Way - Solar Panels
Solar Photovoltaics · Operational
0.248.8 km
Melton Common Wind Cluster
Wind Onshore · Operational
510.1 km
Melton Waste Park
Wind Onshore · Operational
510.2 km
Roxby Gas to Energy
Landfill Gas · Operational
8.510.6 km
Brigg Renewable Energy Plant
Biomass (dedicated) · Operational
4010.7 km
Winterton Landfill Site
Landfill Gas · Operational
3.810.8 km

How big is Bonby Lane?

Bonby Lane has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bonby Lane?

REPD records the operator as Zebec Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bonby Lane approved and built?

The application was submitted on 2014-10-06. Permission was granted on 2015-11-18, 13 months later. The site became operational on 2018-06-01, 30 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4876.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council