White Cross Lane

White Cross Lane is under construction in North Kesteven with a recorded capacity of 25 MW.

25 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Nextpower SPV 5 Limited
North Kesteven
Authority
England

Planning and build timeline

Application submitted2019-06-18
Permission granted2019-12-31
6 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Kesteven’s record on solar

North Kesteven has decided 26 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in North Kesteven

Other built sites within 15 km

SiteMWDistance
Grange Farm (Burton Pedwardine)
Solar Photovoltaics · Operational
150.8 km
Sleaford Renewable Energy Plant
Biomass (dedicated) · Operational
402.8 km
Gorse Lane
Solar Photovoltaics · Under Construction
203.3 km
Deepdale Farm
Solar Photovoltaics · Operational
86.2 km
Bicker Fen
Wind Onshore · Operational
26.710.8 km
Ermine Street Farm solar park
Solar Photovoltaics · Operational
32.511.3 km
Cowbridge Road, Bicker Fen - Solar Array
Solar Photovoltaics · Under Construction
7512 km
Cowbridge Road, Bicker Fen - Battery Storage
Battery · Under Construction
5012 km

How big is White Cross Lane?

White Cross Lane has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates White Cross Lane?

REPD records the operator as Nextpower SPV 5 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was White Cross Lane approved and built?

The application was submitted on 2019-06-18. Permission was granted on 2019-12-31, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6530.