Renewable sitesCowbridge Road, Bicker Fen - Battery Storage

Cowbridge Road, Bicker Fen - Battery Storage

Cowbridge Road, Bicker Fen - Battery Storage is under construction in South Holland with a recorded capacity of 50 MW.

50 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
AGR Solar 2 Limited
South Holland
Authority
England

Planning and build timeline

Application submitted2022-09-09
Permission granted2023-07-21
10 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Holland’s record on battery storage

South Holland has decided 13 battery storage schemes and approved 92%, taking a median of 3.5 months. See every battery storage scheme decision in South Holland

Other built sites within 15 km

SiteMWDistance
Cowbridge Road, Bicker Fen - Solar Array
Solar Photovoltaics · Under Construction
750 km
Bicker Fen
Wind Onshore · Operational
26.71.8 km
Nowhere Farm
Solar Photovoltaics · Operational
8.17.1 km
Kirton Solar PV Farm
Solar Photovoltaics · Operational
3.27.8 km
Fen Road
Solar Photovoltaics · Operational
1.410.5 km
Grange Farm (Burton Pedwardine)
Solar Photovoltaics · Operational
1511.2 km
White Cross Lane
Solar Photovoltaics · Under Construction
2512 km
Pinguin Foods
Solar Photovoltaics · Operational
1.513.7 km

How big is Cowbridge Road, Bicker Fen - Battery Storage?

Cowbridge Road, Bicker Fen - Battery Storage has a recorded installed capacity of 50 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cowbridge Road, Bicker Fen - Battery Storage?

REPD records the operator as AGR Solar 2 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cowbridge Road, Bicker Fen - Battery Storage approved and built?

The application was submitted on 2022-09-09. Permission was granted on 2023-07-21, 10 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12118.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council