Renewable sites › Grange Farm (Burton Pedwardine)
Grange Farm (Burton Pedwardine)
Grange Farm (Burton Pedwardine) is operational in North Kesteven with a recorded capacity of 15 MW, and has been generating since 2014-04-30.
Planning and build timeline
| Application submitted | 2012-11-27 |
| Permission granted | 2013-02-04 2 months after submission |
| Operational | 2014-04-30 15 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Kesteven’s record on solar
North Kesteven has decided 26 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in North Kesteven →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
White Cross Lane Solar Photovoltaics · Under Construction | 25 | 0.8 km |
Sleaford Renewable Energy Plant Biomass (dedicated) · Operational | 40 | 3.5 km |
Gorse Lane Solar Photovoltaics · Under Construction | 20 | 3.9 km |
Deepdale Farm Solar Photovoltaics · Operational | 8 | 6.8 km |
Bicker Fen Wind Onshore · Operational | 26.7 | 10 km |
Cowbridge Road, Bicker Fen - Solar Array Solar Photovoltaics · Under Construction | 75 | 11.2 km |
Cowbridge Road, Bicker Fen - Battery Storage Battery · Under Construction | 50 | 11.2 km |
Ermine Street Farm solar park Solar Photovoltaics · Operational | 32.5 | 12.1 km |
How big is Grange Farm (Burton Pedwardine)?
Grange Farm (Burton Pedwardine) has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Grange Farm (Burton Pedwardine)?
REPD records the operator as Lark Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Grange Farm (Burton Pedwardine) approved and built?
The application was submitted on 2012-11-27. Permission was granted on 2013-02-04, 2 months later. The site became operational on 2014-04-30, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1755.