Novarly ParcelRenewable sites

Renewable sitesDeepdale Farm

Deepdale Farm

Deepdale Farm is operational in North Kesteven with a recorded capacity of 8 MW, and has been generating since 2016-06-30.

8 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-30
Solar Photovoltaics
Technology
Deepdale Farm Solar Ltd
North Kesteven
Authority
England

Planning and build timeline

Application submitted2014-07-16
Permission granted2014-11-10
4 months after submission
Operational2016-06-30
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Kesteven’s record on solar

North Kesteven has decided 26 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in North Kesteven

Other built sites within 15 km

SiteMWDistance
Sleaford Renewable Energy Plant
Biomass (dedicated) · Operational
403.4 km
White Cross Lane
Solar Photovoltaics · Under Construction
256.2 km
Gorse Lane
Solar Photovoltaics · Under Construction
206.7 km
Grange Farm (Burton Pedwardine)
Solar Photovoltaics · Operational
156.8 km
Ermine Street Farm solar park
Solar Photovoltaics · Operational
32.58.3 km
Metheringham Heath (Farm AD)
Anaerobic Digestion · Operational
6.512.8 km

How big is Deepdale Farm?

Deepdale Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Deepdale Farm?

REPD records the operator as Deepdale Farm Solar Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Deepdale Farm approved and built?

The application was submitted on 2014-07-16. Permission was granted on 2014-11-10, 4 months later. The site became operational on 2016-06-30, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2204.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council