Renewable sites › Sleaford Renewable Energy Plant
Sleaford Renewable Energy Plant
Sleaford Renewable Energy Plant is an operational 40 MW biomass plant in North Kesteven, generating since 28 November 2014. Planning permission was granted on 4 November 2008, 2 months after submission. Operator of record: Glenmont Partners.
Planning and build timeline
| Application submitted | 20 August 2008 |
| Permission granted | 4 November 2008 2 months after submission |
| Operational | 28 November 2014 73 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in North Kesteven: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Sleaford Renewable Energy Plant’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 25 | 2.8 km |
Solar Photovoltaics · Operational | 8 | 3.4 km |
Solar Photovoltaics · Operational | 15 | 3.5 km |
Solar Photovoltaics · Under Construction | 20 | 4 km |
Solar Photovoltaics · Operational | 32.5 | 9.5 km |
Wind Onshore · Operational | 26.7 | 13 km |
Solar Photovoltaics · Under Construction | 75 | 14.4 km |
Battery · Under Construction | 50 | 14.4 km |
How big is Sleaford Renewable Energy Plant?
Sleaford Renewable Energy Plant has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sleaford Renewable Energy Plant?
REPD records the operator as Glenmont Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sleaford Renewable Energy Plant approved and built?
The application was submitted on 20 August 2008. Permission was granted on 4 November 2008, 2 months later. The site became operational on 28 November 2014, 73 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 206.