Renewable sites › Cowbridge Road, Bicker Fen - Solar Array
Cowbridge Road, Bicker Fen - Solar Array
Cowbridge Road, Bicker Fen - Solar Array is under construction in South Holland with a recorded capacity of 75 MW.
Planning and build timeline
| Application submitted | 2022-09-09 |
| Permission granted | 2023-07-21 10 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Holland’s record on solar
South Holland has decided 24 solar farms and approved 88%, taking a median of 2.5 months. See every solar farm decision in South Holland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cowbridge Road, Bicker Fen - Battery Storage Battery · Under Construction | 50 | 0 km |
Bicker Fen Wind Onshore · Operational | 26.7 | 1.8 km |
Nowhere Farm Solar Photovoltaics · Operational | 8.1 | 7.1 km |
Kirton Solar PV Farm Solar Photovoltaics · Operational | 3.2 | 7.8 km |
Fen Road Solar Photovoltaics · Operational | 1.4 | 10.5 km |
Grange Farm (Burton Pedwardine) Solar Photovoltaics · Operational | 15 | 11.2 km |
White Cross Lane Solar Photovoltaics · Under Construction | 25 | 12 km |
Pinguin Foods Solar Photovoltaics · Operational | 1.5 | 13.7 km |
How big is Cowbridge Road, Bicker Fen - Solar Array?
Cowbridge Road, Bicker Fen - Solar Array has a recorded installed capacity of 75 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cowbridge Road, Bicker Fen - Solar Array?
REPD records the operator as AGR Solar 2 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cowbridge Road, Bicker Fen - Solar Array approved and built?
The application was submitted on 2022-09-09. Permission was granted on 2023-07-21, 10 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12117.
Novarly Parcel · official public data, read properly · parcel.novarly.com