Renewable sitesMiddle Balbeggie Wind Turbines

Middle Balbeggie Wind Turbines

Middle Balbeggie Wind Turbines is operational in Fife with a recorded capacity of 6.4 MW, and has been generating since 2016-11-20.

6.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-11-20
Wind Onshore
Technology
Capital Dynamics
Fife
Authority
Scotland

Planning and build timeline

Application submitted2012-09-28
Permission granted2014-01-29
16 months after submission
Operational2016-11-20
34 months after consent

Fife’s record on onshore wind

Fife has decided 28 onshore wind schemes and approved 54%, taking a median of 16.1 months. See every onshore wind scheme decision in Fife

Other built sites within 15 km

SiteMWDistance
Noble Foods
Wind Onshore · Operational
1.51.2 km
Middle Balbeggie
Solar Photovoltaics · Operational
51.3 km
Skeddoway Farm Wind Turbine
Wind Onshore · Operational
1.51.5 km
West Strathore Solar Limited
Solar Photovoltaics · Operational
51.5 km
Kirkcaldy W W T W, Nether Street- Solar Panels
Solar Photovoltaics · Operational
0.653.9 km
Inchdairnie
Anaerobic Digestion · Operational
24 km
Markinch Biomass CHP Plant
Biomass (dedicated) · Operational
655.3 km
Finmont Service Reservoir
Solar Photovoltaics · Operational
0.35.6 km

How big is Middle Balbeggie Wind Turbines?

Middle Balbeggie Wind Turbines has a recorded installed capacity of 6.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Middle Balbeggie Wind Turbines?

REPD records the operator as Capital Dynamics. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Middle Balbeggie Wind Turbines approved and built?

The application was submitted on 2012-09-28. Permission was granted on 2014-01-29, 16 months later. The site became operational on 2016-11-20, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4094.