Welkin Road, Bredbury - Battery Storage System is an operational 20 MW battery storage site in Stockport, generating since 5 January 2026. Planning permission was granted on 25 January 2021, 1 months after submission. Operator of record: Arlington Energy Limited.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 5 January 2026
Battery
Technology
Arlington Energy Limited
Stockport
Authority
England

Planning and build timeline

Application submitted22 December 2020
Permission granted25 January 2021
1 months after submission
Operational5 January 2026
59 months after consent

Screening a site of your own?

RedlineUK · £39

Stockport approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Welkin Road, Bredbury - Battery Storage System’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stockport’s record on battery storage

Stockport has decided 8 battery storage schemes and approved 100%, taking a median of 6.7 months. See every battery storage scheme decision in Stockport

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
49.90.1 km
Battery · Under Construction
49.90.3 km
Anaerobic Digestion · Operational
21.9 km
Solar Photovoltaics · Operational
0.272.7 km
Solar Photovoltaics · Operational
1.163.7 km
Solar Photovoltaics · Operational
0.75.7 km
Solar Photovoltaics · Operational
36.7 km
Solar Photovoltaics · Operational
0.67.3 km

How big is Welkin Road, Bredbury - Battery Storage System?

Welkin Road, Bredbury - Battery Storage System has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Welkin Road, Bredbury - Battery Storage System?

REPD records the operator as Arlington Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Welkin Road, Bredbury - Battery Storage System approved and built?

The application was submitted on 22 December 2020. Permission was granted on 25 January 2021, 1 months later. The site became operational on 5 January 2026, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13740.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode