Renewable sitesWelkin Road, Bredbury - Battery Storage System

Welkin Road, Bredbury - Battery Storage System

Welkin Road, Bredbury - Battery Storage System is operational in Stockport with a recorded capacity of 20 MW, and has been generating since 2026-01-05.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2026-01-05
Battery
Technology
Arlington Energy Limited
Stockport
Authority
England

Planning and build timeline

Application submitted2020-12-22
Permission granted2021-01-25
1 months after submission
Operational2026-01-05
59 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stockport’s record on battery storage

Stockport has decided 8 battery storage schemes and approved 100%, taking a median of 6.7 months. See every battery storage scheme decision in Stockport

Other built sites within 15 km

SiteMWDistance
Welkin Mill, Welkin Road - Battery Storage
Battery · Under Construction
49.90.1 km
Bredbury Substation - Battery Storage Facility
Battery · Under Construction
49.90.3 km
Bredbury Park Way - AD Stockport (Waste AD)
Anaerobic Digestion · Operational
21.9 km
Audi Stockport, Brinksway, Edgeley - Solar Panels
Solar Photovoltaics · Operational
0.272.7 km
Denton Hall Farm Road, Denton - Solar Photovoltaic System
Solar Photovoltaics · Operational
1.163.7 km
Tesco Super-Store (Garratt Way, Gorton)
Solar Photovoltaics · Operational
0.75.7 km
Godley Water Treatment Works
Solar Photovoltaics · Operational
36.7 km
Outer Space Studios Solar Panels
Solar Photovoltaics · Operational
0.67.3 km

How big is Welkin Road, Bredbury - Battery Storage System?

Welkin Road, Bredbury - Battery Storage System has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Welkin Road, Bredbury - Battery Storage System?

REPD records the operator as Arlington Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Welkin Road, Bredbury - Battery Storage System approved and built?

The application was submitted on 2020-12-22. Permission was granted on 2021-01-25, 1 months later. The site became operational on 2026-01-05, 59 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13740.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council