Novarly ParcelRenewable sites

Renewable sitesWelkin Mill, Welkin Road - Battery Storage

Welkin Mill, Welkin Road - Battery Storage

Welkin Mill, Welkin Road - Battery Storage is a 49.9 MW battery storage site under construction in Stockport. Planning permission was granted on 1 August 2023, 8 months after submission. Operator of record: Noriker Power Limited.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Noriker Power Limited
Stockport
Authority
England

Planning and build timeline

Application submitted9 December 2022
Permission granted1 August 2023
8 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Stockport approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Welkin Mill, Welkin Road - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stockport’s record on battery storage

Stockport has decided 8 battery storage schemes and approved 100%, taking a median of 6.7 months. See every battery storage scheme decision in Stockport

Other built sites within 15 km

SiteMWDistance
Battery · Operational
200.1 km
Battery · Under Construction
49.90.4 km
Anaerobic Digestion · Operational
21.9 km
Solar Photovoltaics · Operational
0.272.8 km
Solar Photovoltaics · Operational
1.163.6 km
Solar Photovoltaics · Operational
0.75.6 km
Solar Photovoltaics · Operational
36.7 km
Solar Photovoltaics · Operational
0.67.2 km

How big is Welkin Mill, Welkin Road - Battery Storage?

Welkin Mill, Welkin Road - Battery Storage has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Welkin Mill, Welkin Road - Battery Storage?

REPD records the operator as Noriker Power Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Welkin Mill, Welkin Road - Battery Storage approved and built?

The application was submitted on 9 December 2022. Permission was granted on 1 August 2023, 8 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12982.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode