Renewable sitesOuter Space Studios Solar Panels

Outer Space Studios Solar Panels

Outer Space Studios Solar Panels is operational in Manchester with a recorded capacity of 0.6 MW, and has been generating since 2021-12-01.

0.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-12-01
Solar Photovoltaics
Technology
Ameresco Limited
Manchester
Authority
England

Planning and build timeline

Application submitted2021-06-03
Permission granted2021-11-04
5 months after submission
Operational2021-12-01
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Manchester’s record on solar

Manchester has decided 45 solar farms and approved 91%, taking a median of 1.7 months. See every solar farm decision in Manchester

Other built sites within 15 km

SiteMWDistance
Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant)
EfW Incineration · Operational
33.50.8 km
City Football Academy, Ashton New Road - Solar panels
Solar Photovoltaics · Under Construction
3.381.4 km
Tesco Super-Store (Garratt Way, Gorton)
Solar Photovoltaics · Operational
0.71.9 km
The National Cycling Centre Velodrome
Solar Photovoltaics · Operational
0.71.9 km
The National Cycling Centre - Solar Photovoltaic Panels
Solar Photovoltaics · Under Construction
0.921.9 km
Royal Northern College Of Music, Oxford Road - Solar Photovoltaic panels
Solar Photovoltaics · Under Construction
0.172.5 km
Central Park - Solar photovaltics
Solar Photovoltaics · Operational
0.153.7 km
Moston Vale
Battery · Under Construction
104 km

How big is Outer Space Studios Solar Panels?

Outer Space Studios Solar Panels has a recorded installed capacity of 0.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Outer Space Studios Solar Panels?

REPD records the operator as Ameresco Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Outer Space Studios Solar Panels approved and built?

The application was submitted on 2021-06-03. Permission was granted on 2021-11-04, 5 months later. The site became operational on 2021-12-01, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9150.