Renewable sitesAudi Stockport, Brinksway, Edgeley - Solar Panels

Audi Stockport, Brinksway, Edgeley - Solar Panels

Audi Stockport, Brinksway, Edgeley - Solar Panels is an operational 0.27 MW solar farm in Stockport, generating since 1 December 2022. Planning permission was granted on 5 October 2023, 17 months after submission. Operator of record: Smith Knight Fay.

0.27 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2022
Solar Photovoltaics
Technology
Smith Knight Fay
Stockport
Authority
England

Planning and build timeline

Application submitted6 May 2022
Permission granted5 October 2023
17 months after submission
Operational1 December 2022

Screening a site of your own?

RedlineUK · £39

Stockport approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Audi Stockport, Brinksway, Edgeley - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stockport’s record on solar

Stockport has decided 12 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Stockport

Other built sites within 15 km

SiteMWDistance
Battery · Operational
202.7 km
Battery · Under Construction
49.92.8 km
Battery · Under Construction
49.92.8 km
Anaerobic Digestion · Operational
24.6 km
Anaerobic Digestion · Operational
25 km
Solar Photovoltaics · Operational
1.165.5 km
Solar Photovoltaics · Operational
0.76.2 km
Solar Photovoltaics · Operational
0.67.2 km

How big is Audi Stockport, Brinksway, Edgeley - Solar Panels?

Audi Stockport, Brinksway, Edgeley - Solar Panels has a recorded installed capacity of 0.27 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Audi Stockport, Brinksway, Edgeley - Solar Panels?

REPD records the operator as Smith Knight Fay. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Audi Stockport, Brinksway, Edgeley - Solar Panels approved and built?

The application was submitted on 6 May 2022. Permission was granted on 5 October 2023, 17 months later. The site became operational on 1 December 2022.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11291.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode