Renewable sitesBredbury Park Way - AD Stockport (Waste AD)

Bredbury Park Way - AD Stockport (Waste AD)

Bredbury Park Way - AD Stockport (Waste AD) is operational in Stockport with a recorded capacity of 2 MW, and has been generating since 2011-10-03.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-10-03
Anaerobic Digestion
Technology
Greater Manchester Waste
Stockport
Authority
England

Planning and build timeline

Application submitted2007-08-06
Permission granted2007-11-02
3 months after submission
Operational2011-10-03
47 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Welkin Mill, Welkin Road - Battery Storage
Battery · Under Construction
49.91.9 km
Welkin Road, Bredbury - Battery Storage System
Battery · Operational
201.9 km
Bredbury Substation - Battery Storage Facility
Battery · Under Construction
49.92 km
Denton Hall Farm Road, Denton - Solar Photovoltaic System
Solar Photovoltaics · Operational
1.162.7 km
Audi Stockport, Brinksway, Edgeley - Solar Panels
Solar Photovoltaics · Operational
0.274.6 km
Godley Water Treatment Works
Solar Photovoltaics · Operational
34.8 km
Tesco Super-Store (Garratt Way, Gorton)
Solar Photovoltaics · Operational
0.75.5 km
Outer Space Studios Solar Panels
Solar Photovoltaics · Operational
0.67.3 km

How big is Bredbury Park Way - AD Stockport (Waste AD)?

Bredbury Park Way - AD Stockport (Waste AD) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bredbury Park Way - AD Stockport (Waste AD)?

REPD records the operator as Greater Manchester Waste. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bredbury Park Way - AD Stockport (Waste AD) approved and built?

The application was submitted on 2007-08-06. Permission was granted on 2007-11-02, 3 months later. The site became operational on 2011-10-03, 47 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 263.