Renewable sitesDenton Hall Farm Road, Denton - Solar Photovoltaic System

Denton Hall Farm Road, Denton - Solar Photovoltaic System

Denton Hall Farm Road, Denton - Solar Photovoltaic System is operational in Tameside with a recorded capacity of 1.16 MW.

1.16 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Solar Photovoltaics
Technology
System 3 Limited
Tameside
Authority
England

Planning and build timeline

Application submitted2022-01-11
Permission granted2023-07-13
18 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tameside’s record on solar

Tameside has decided 8 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Tameside

Other built sites within 15 km

SiteMWDistance
Bredbury Park Way - AD Stockport (Waste AD)
Anaerobic Digestion · Operational
22.7 km
Tesco Super-Store (Garratt Way, Gorton)
Solar Photovoltaics · Operational
0.73 km
Welkin Mill, Welkin Road - Battery Storage
Battery · Under Construction
49.93.6 km
Welkin Road, Bredbury - Battery Storage System
Battery · Operational
203.7 km
Bredbury Substation - Battery Storage Facility
Battery · Under Construction
49.93.9 km
Outer Space Studios Solar Panels
Solar Photovoltaics · Operational
0.64.9 km
Godley Water Treatment Works
Solar Photovoltaics · Operational
35 km
City Football Academy, Ashton New Road - Solar panels
Solar Photovoltaics · Under Construction
3.385.4 km

How big is Denton Hall Farm Road, Denton - Solar Photovoltaic System?

Denton Hall Farm Road, Denton - Solar Photovoltaic System has a recorded installed capacity of 1.16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Denton Hall Farm Road, Denton - Solar Photovoltaic System?

REPD records the operator as System 3 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Denton Hall Farm Road, Denton - Solar Photovoltaic System approved and built?

The application was submitted on 2022-01-11. Permission was granted on 2023-07-13, 18 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10422.