Denton Hall Farm Road, Denton - Solar Photovoltaic System is an operational 1.16 MW solar farm in Tameside. Planning permission was granted on 13 July 2023, 18 months after submission. Operator of record: System 3 Limited.
Planning and build timeline
| Application submitted | 11 January 2022 |
| Permission granted | 13 July 2023 18 months after submission |
| Operational | not recorded |
Screening a site of your own?
Tameside approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Denton Hall Farm Road, Denton - Solar Photovoltaic System’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Tameside’s record on solar
Tameside has decided 8 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Tameside →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 2 | 2.7 km |
Solar Photovoltaics · Operational | 0.7 | 3 km |
Battery · Under Construction | 49.9 | 3.6 km |
Battery · Operational | 20 | 3.7 km |
Battery · Under Construction | 49.9 | 3.9 km |
Solar Photovoltaics · Operational | 0.6 | 4.9 km |
Solar Photovoltaics · Operational | 3 | 5 km |
Solar Photovoltaics · Under Construction | 3.38 | 5.4 km |
How big is Denton Hall Farm Road, Denton - Solar Photovoltaic System?
Denton Hall Farm Road, Denton - Solar Photovoltaic System has a recorded installed capacity of 1.16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Denton Hall Farm Road, Denton - Solar Photovoltaic System?
REPD records the operator as System 3 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Denton Hall Farm Road, Denton - Solar Photovoltaic System approved and built?
The application was submitted on 11 January 2022. Permission was granted on 13 July 2023, 18 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10422.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode