Renewable planning › Battery storage › Stockport
Battery storage planning in Stockport
Stockport has decided 8 battery storage schemes and approved 100% of them, taking a median of 6.7 months to decide. Consented capacity: 342 MW. 2 applications still awaiting a decision.
How Stockport compares
Against the 137 UK authorities with 5+ battery storage decisions, Stockport sits in the 73rd percentile for approval rate (8 points above the England average) and the 39th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (11)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Adswood Road - Battery Energy Storage Conrad Energy (Developments) II Limited · DC/094516 · 7.4 mo to decide | — | Awaiting Construction | 2025-08-26 |
Ashton Road, Bredbury - Battery Energy Storage Cragside Energy Limited · DC/094002 · 6.5 mo to decide | 75 | Awaiting Construction | 2025-07-24 |
Woodford Road - Battery Energy Storage System Pegasus Group · 24/5075/FUL · 5.4 mo to decide | 100 | Awaiting Construction | 2025-05-30 |
Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage Queequeg Renewables Limited · DC/090340 · 8.7 mo to decide | 40 | Awaiting Construction | 2024-08-23 |
Herrod Avenue, South Reddish - Battery Energy Storage Infra Balance New Energy Limited · DC/090561 | — | Application Withdrawn | 2024-06-05 |
Welkin Mill, Welkin Road - Battery Storage Noriker Power Limited · DC/087394 · 7.7 mo to decide | 49.9 | Under Construction | 2023-08-01 |
Newby Road, Hazel Grove - Battery Storage AMP Energy Services Limited · DC/084337 · 6.9 mo to decide | 7.5 | Awaiting Construction | 2022-11-08 |
Bredbury Substation - Battery Storage Facility Private Developer · DC/082085 · 2.7 mo to decide | 49.9 | Under Construction | 2021-12-02 |
Welkin Road, Bredbury - Battery Storage System Arlington Energy Limited · DC/078965 · 1.1 mo to decide | 20 | Operational | 2021-01-25 |
Welkin Mill Noriker Power · DC/077298 | 49.9 | Revised | 2020-08-24 |
Welkin Mill Noriker Power · DC/075050 | 49.9 | Revised | 2020-05-28 |
Does Stockport approve battery storage schemes?
Yes — of the 8 battery storage schemes Stockport has decided, 100% were approved (8 granted, 0 refused). The UK-wide rate for battery storage is 92%.
How long does a battery storage scheme application take in Stockport?
The median time from application to decision is 6.7 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Stockport consented?
342 MW has been consented across 8 approved schemes. A further 2 applications awaits a decision.
Other technologies in Stockport
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com