Novarly ParcelRenewable sites

Renewable sitesGodley Water Treatment Works

Godley Water Treatment Works

Godley Water Treatment Works is operational in Tameside with a recorded capacity of 3 MW, and has been generating since 2016-04-22.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-04-22
Solar Photovoltaics
Technology
United Utilities
Tameside
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2016-04-22

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tameside’s record on solar

Tameside has decided 8 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Tameside

Other built sites within 15 km

SiteMWDistance
Bredbury Park Way - AD Stockport (Waste AD)
Anaerobic Digestion · Operational
24.8 km
Denton Hall Farm Road, Denton - Solar Photovoltaic System
Solar Photovoltaics · Operational
1.165 km
Welkin Mill, Welkin Road - Battery Storage
Battery · Under Construction
49.96.7 km
Welkin Road, Bredbury - Battery Storage System
Battery · Operational
206.7 km
Bredbury Substation - Battery Storage Facility
Battery · Under Construction
49.96.8 km
Tesco Super-Store (Garratt Way, Gorton)
Solar Photovoltaics · Operational
0.77.7 km
Land at Wrigley Head
Solar Photovoltaics · Under Construction
0.99.3 km
The National Cycling Centre - Solar Photovoltaic Panels
Solar Photovoltaics · Under Construction
0.929.4 km

How big is Godley Water Treatment Works?

Godley Water Treatment Works has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Godley Water Treatment Works?

REPD records the operator as United Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Godley Water Treatment Works approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-04-22.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5756.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council