Novarly ParcelRenewable sites

Renewable sitesWaterditch Solar Farm

Waterditch Solar Farm

Waterditch Solar Farm is an operational 18 MW solar farm in Bournemouth, Christchurch and Poole, generating since 31 March 2016. Planning permission was granted on 24 June 2015, 1 months after submission. Operator of record: New Forest Energy.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2016
Solar Photovoltaics
Technology
New Forest Energy
Bournemouth, Christchurch and Poole
Authority
England

Planning and build timeline

Application submitted21 May 2015
Permission granted24 June 2015
1 months after submission
Operational31 March 2016
9 months after consent

Screening a site of your own?

RedlineUK · £39

Bournemouth, Christchurch and Poole approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Waterditch Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bournemouth, Christchurch and Poole’s record on solar

Bournemouth, Christchurch and Poole has decided 25 solar farms and approved 88%, taking a median of 2.3 months. See every solar farm decision in Bournemouth, Christchurch and Poole

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
180.4 km
Solar Photovoltaics · Operational
7.23.4 km
Solar Photovoltaics · Operational
1.75.1 km
Biomass (dedicated) · Operational
1.55.3 km
Landfill Gas · Operational
2.85.9 km
EfW Incineration · Under Construction
3.47.9 km
Biomass (dedicated) · Operational
3.28 km
Solar Photovoltaics · Operational
88.2 km

How big is Waterditch Solar Farm?

Waterditch Solar Farm has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Waterditch Solar Farm?

REPD records the operator as New Forest Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Waterditch Solar Farm approved and built?

The application was submitted on 21 May 2015. Permission was granted on 24 June 2015, 1 months later. The site became operational on 31 March 2016, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5315.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode