Renewable sites › Christchurch Energy
Christchurch Energy
Christchurch Energy is operational in Bournemouth, Christchurch and Poole with a recorded capacity of 18 MW, and has been generating since 2015-03-27.
Planning and build timeline
| Application submitted | 2014-05-21 |
| Permission granted | 2014-08-29 3 months after submission |
| Operational | 2015-03-27 7 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — Bournemouth, Christchurch and Poole
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Bournemouth, Christchurch and Poole’s record on solar
Bournemouth, Christchurch and Poole has decided 25 solar farms and approved 88%, taking a median of 2.3 months. See every solar farm decision in Bournemouth, Christchurch and Poole →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Waterditch Solar Farm Solar Photovoltaics · Operational | 18 | 0.4 km |
Office Field Solar Photovoltaics · Operational | 7.2 | 3.3 km |
Beckley Solar Farm Solar Photovoltaics · Operational | 1.7 | 5 km |
Double H Nurseries Biomass Plant Biomass (dedicated) · Operational | 1.5 | 5.1 km |
Efford Landfill (Newmilton) Landfill Gas · Operational | 2.8 | 5.8 km |
Chapel Lane ERF EfW Incineration · Under Construction | 3.4 | 8.2 km |
Eco Composting Biomass (dedicated) · Operational | 3.2 | 8.3 km |
Hale Farm Solar Photovoltaics · Operational | 8 | 8.4 km |
How big is Christchurch Energy?
Christchurch Energy has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Christchurch Energy?
REPD records the operator as New Forest Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Christchurch Energy approved and built?
The application was submitted on 2014-05-21. Permission was granted on 2014-08-29, 3 months later. The site became operational on 2015-03-27, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2308.
Novarly Parcel · official public data, read properly · parcel.novarly.com