Eco Composting is an operational 3.2 MW biomass plant in Bournemouth, Christchurch and Poole, generating since 22 March 2017. Planning permission was granted on 26 July 2011, 2 months after submission. Operator of record: Eco Sustainable Solutions.

3.2 MW
Capacity
as recorded in REPD
Operational
Status
since 22 March 2017
Biomass (dedicated)
Technology
Eco Sustainable Solutions
Bournemouth, Christchurch and Poole
Authority
England

Planning and build timeline

Application submitted26 May 2011
Permission granted26 July 2011
2 months after submission
Operational22 March 2017
68 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bournemouth, Christchurch and Poole: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Eco Composting’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Under Construction
3.40.5 km
Solar Photovoltaics · Operational
200.7 km
Solar Photovoltaics · Operational
81 km
Solar Photovoltaics · Operational
361.1 km
Solar Photovoltaics · Operational
3.81.5 km
Solar Photovoltaics · Operational
42 km
Solar Photovoltaics · Operational
75.9 km
Solar Photovoltaics · Operational
13.26.8 km

How big is Eco Composting?

Eco Composting has a recorded installed capacity of 3.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Eco Composting?

REPD records the operator as Eco Sustainable Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eco Composting approved and built?

The application was submitted on 26 May 2011. Permission was granted on 26 July 2011, 2 months later. The site became operational on 22 March 2017, 68 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 139.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode