Beckley Solar Farm

Beckley Solar Farm is operational in New Forest with a recorded capacity of 1.7 MW, and has been generating since 2012-07-27.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-07-27
Solar Photovoltaics
Technology
Anesco
New Forest
Authority
England

Planning and build timeline

Application submitted2012-04-19
Permission granted2012-06-15
2 months after submission
Operational2012-07-27
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

New Forest’s record on solar

New Forest has decided 20 solar farms and approved 75%, taking a median of 2.2 months. See every solar farm decision in New Forest

Other built sites within 15 km

SiteMWDistance
Efford Landfill (Newmilton)
Landfill Gas · Operational
2.80.9 km
Double H Nurseries Biomass Plant
Biomass (dedicated) · Operational
1.51.2 km
Office Field
Solar Photovoltaics · Operational
7.21.8 km
Christchurch Energy
Solar Photovoltaics · Operational
185 km
Waterditch Solar Farm
Solar Photovoltaics · Operational
185.1 km
Pennington Recycling Centre
Solar Photovoltaics · Operational
1.28.6 km
Lower Pennington Farm
Solar Photovoltaics · Operational
2.79.3 km
Chapel Lane ERF
EfW Incineration · Under Construction
3.412.6 km

How big is Beckley Solar Farm?

Beckley Solar Farm has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beckley Solar Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beckley Solar Farm approved and built?

The application was submitted on 2012-04-19. Permission was granted on 2012-06-15, 2 months later. The site became operational on 2012-07-27, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1252.