Double H Nurseries Biomass Plant

Double H Nurseries Biomass Plant is an operational 1.5 MW biomass plant in New Forest, generating since 15 December 2012. Planning permission was granted on 29 May 2012, 4 months after submission. Operator of record: Double H Nurseries.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 December 2012
Biomass (dedicated)
Technology
Double H Nurseries
New Forest
Authority
England

Planning and build timeline

Application submitted25 January 2012
Permission granted29 May 2012
4 months after submission
Operational15 December 2012
7 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in New Forest: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Double H Nurseries Biomass Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.81 km
Solar Photovoltaics · Operational
1.71.2 km
Solar Photovoltaics · Operational
7.21.9 km
Solar Photovoltaics · Operational
185.1 km
Solar Photovoltaics · Operational
185.3 km
Solar Photovoltaics · Operational
1.28.2 km
Solar Photovoltaics · Operational
2.78.9 km
EfW Incineration · Under Construction
3.413.1 km

How big is Double H Nurseries Biomass Plant?

Double H Nurseries Biomass Plant has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Double H Nurseries Biomass Plant?

REPD records the operator as Double H Nurseries. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Double H Nurseries Biomass Plant approved and built?

The application was submitted on 25 January 2012. Permission was granted on 29 May 2012, 4 months later. The site became operational on 15 December 2012, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 22.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode