Double H Nurseries Biomass Plant

Double H Nurseries Biomass Plant is operational in New Forest with a recorded capacity of 1.5 MW, and has been generating since 2012-12-15.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-12-15
Biomass (dedicated)
Technology
Double H Nurseries
New Forest
Authority
England

Planning and build timeline

Application submitted2012-01-25
Permission granted2012-05-29
4 months after submission
Operational2012-12-15
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Efford Landfill (Newmilton)
Landfill Gas · Operational
2.81 km
Beckley Solar Farm
Solar Photovoltaics · Operational
1.71.2 km
Office Field
Solar Photovoltaics · Operational
7.21.9 km
Christchurch Energy
Solar Photovoltaics · Operational
185.1 km
Waterditch Solar Farm
Solar Photovoltaics · Operational
185.3 km
Pennington Recycling Centre
Solar Photovoltaics · Operational
1.28.2 km
Lower Pennington Farm
Solar Photovoltaics · Operational
2.78.9 km
Chapel Lane ERF
EfW Incineration · Under Construction
3.413.1 km

How big is Double H Nurseries Biomass Plant?

Double H Nurseries Biomass Plant has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Double H Nurseries Biomass Plant?

REPD records the operator as Double H Nurseries. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Double H Nurseries Biomass Plant approved and built?

The application was submitted on 2012-01-25. Permission was granted on 2012-05-29, 4 months later. The site became operational on 2012-12-15, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 22.