Office Field is an operational 7.2 MW solar farm in New Forest, generating since 28 March 2013. Planning permission was granted on 11 December 2012, 2 months after submission. Operator of record: Anesco.
Planning and build timeline
| Application submitted | 15 October 2012 |
| Permission granted | 11 December 2012 2 months after submission |
| Operational | 28 March 2013 4 months after consent |
Screening a site of your own?
New Forest approves 75% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Office Field’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — New Forest
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
New Forest’s record on solar
New Forest has decided 20 solar farms and approved 75%, taking a median of 2.2 months. See every solar farm decision in New Forest →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.7 | 1.8 km |
Biomass (dedicated) · Operational | 1.5 | 1.9 km |
Landfill Gas · Operational | 2.8 | 2.5 km |
Solar Photovoltaics · Operational | 18 | 3.3 km |
Solar Photovoltaics · Operational | 18 | 3.4 km |
Solar Photovoltaics · Operational | 1.2 | 10.1 km |
Solar Photovoltaics · Operational | 2.7 | 10.8 km |
EfW Incineration · Under Construction | 3.4 | 11.2 km |
How big is Office Field?
Office Field has a recorded installed capacity of 7.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Office Field?
REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Office Field approved and built?
The application was submitted on 15 October 2012. Permission was granted on 11 December 2012, 2 months later. The site became operational on 28 March 2013, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1273.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode