Renewable sites › Efford Landfill (Newmilton)
Efford Landfill (Newmilton)
Efford Landfill (Newmilton) is operational in New Forest with a recorded capacity of 2.8 MW, and has been generating since 2004-11-01.
Planning and build timeline
| Application submitted | 2003-04-30 |
| Permission granted | 2003-11-18 7 months after submission |
| Operational | 2004-11-01 11 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Beckley Solar Farm Solar Photovoltaics · Operational | 1.7 | 0.9 km |
Double H Nurseries Biomass Plant Biomass (dedicated) · Operational | 1.5 | 1 km |
Office Field Solar Photovoltaics · Operational | 7.2 | 2.5 km |
Christchurch Energy Solar Photovoltaics · Operational | 18 | 5.8 km |
Waterditch Solar Farm Solar Photovoltaics · Operational | 18 | 5.9 km |
Pennington Recycling Centre Solar Photovoltaics · Operational | 1.2 | 7.7 km |
Lower Pennington Farm Solar Photovoltaics · Operational | 2.7 | 8.4 km |
Chapel Lane ERF EfW Incineration · Under Construction | 3.4 | 13.5 km |
How big is Efford Landfill (Newmilton)?
Efford Landfill (Newmilton) has a recorded installed capacity of 2.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Efford Landfill (Newmilton)?
REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Efford Landfill (Newmilton) approved and built?
The application was submitted on 2003-04-30. Permission was granted on 2003-11-18, 7 months later. The site became operational on 2004-11-01, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 699.