Kneller Hall School is a 0.25 MW solar farm under construction in Richmond upon Thames. Planning permission was granted on 15 October 2025, 34 months after submission. Operator of record: Radnor House School Limited.
Planning and build timeline
| Application submitted | 2 December 2022 |
| Permission granted | 15 October 2025 34 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Richmond upon Thames: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Kneller Hall School’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Sewage Sludge Digestion · Operational | 5.8 | 1.3 km |
Solar Photovoltaics · Under Construction | 0.43 | 3 km |
Battery · Operational | — | 5.9 km |
Solar Photovoltaics · Operational | 1.7 | 6.1 km |
Battery · Operational | 0.2 | 6.1 km |
Solar Photovoltaics · Operational | 1.8 | 6.5 km |
Solar Photovoltaics · Operational | 0.55 | 6.8 km |
Biomass (dedicated) · Operational | 1.8 | 7.6 km |
How big is Kneller Hall School?
Kneller Hall School has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Kneller Hall School?
REPD records the operator as Radnor House School Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Kneller Hall School approved and built?
The application was submitted on 2 December 2022. Permission was granted on 15 October 2025, 34 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12764.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode