Kneller Hall School

Kneller Hall School is under construction in Richmond upon Thames with a recorded capacity of 0.25 MW.

0.25 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Radnor House School Limited
Richmond upon Thames
Authority
England

Planning and build timeline

Application submitted2022-12-02
Permission granted2025-10-15
34 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Mogden STW
Sewage Sludge Digestion · Operational
5.81.3 km
Ham Close - 452 Houses, Flats & Leisure Centre
Solar Photovoltaics · Under Construction
0.433 km
Southall Lane Waste Depot
Battery · Operational
5.9 km
Western International Market
Solar Photovoltaics · Operational
1.76.1 km
Western International Market (WIM) Site
Battery · Operational
0.26.1 km
Walton WTW PV
Solar Photovoltaics · Operational
1.86.5 km
Hurst Road - Walton Solar PV Farm
Solar Photovoltaics · Operational
0.556.8 km
Heathrow Airport Biomass CHP
Biomass (dedicated) · Operational
1.87.6 km

How big is Kneller Hall School?

Kneller Hall School has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kneller Hall School?

REPD records the operator as Radnor House School Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kneller Hall School approved and built?

The application was submitted on 2022-12-02. Permission was granted on 2025-10-15, 34 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12764.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council