Renewable sitesMogden STW

Mogden STW

Mogden STW is operational in Hounslow with a recorded capacity of 5.8 MW, and has been generating since 2017-02-21.

5.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-02-21
Sewage Sludge Digestion
Technology
Thames Water Utilities
Hounslow
Authority
England

Planning and build timeline

Application submitted2013-07-02
Permission grantednot recorded
Operational2017-02-21

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Kneller Hall School
Solar Photovoltaics · Under Construction
0.251.3 km
Ham Close - 452 Houses, Flats & Leisure Centre
Solar Photovoltaics · Under Construction
0.433.3 km
Southall Lane Waste Depot
Battery · Operational
5.8 km
Western International Market
Solar Photovoltaics · Operational
1.75.9 km
Western International Market (WIM) Site
Battery · Operational
0.25.9 km
Walton WTW PV
Solar Photovoltaics · Operational
1.87.8 km
Hurst Road - Walton Solar PV Farm
Solar Photovoltaics · Operational
0.558 km
Heathrow Airport Biomass CHP
Biomass (dedicated) · Operational
1.88.3 km

How big is Mogden STW?

Mogden STW has a recorded installed capacity of 5.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mogden STW?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mogden STW approved and built?

The application was submitted on 2013-07-02. REPD does not record a grant date. The site became operational on 2017-02-21.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6558.