Renewable sites › Waltham Point Distribution Centre
Waltham Point Distribution Centre
Waltham Point Distribution Centre is an operational 1.8 MW solar farm in Epping Forest, generating since 5 February 2016. REPD does not record the planning grant date. Operator of record: Sainsburys Supermarkets Limited.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 5 February 2016 |
Screening a site of your own?
Epping Forest approves 89% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Waltham Point Distribution Centre’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Epping Forest’s record on solar
Epping Forest has decided 9 solar farms and approved 89%, taking a median of 6.3 months. See every solar farm decision in Epping Forest →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 0.2 | 2.7 km |
Anaerobic Digestion · Operational | 3 | 6.3 km |
Anaerobic Digestion · Operational | 1.5 | 7.3 km |
EfW Incineration · Operational | 55 | 7.4 km |
Solar Photovoltaics · Operational | 0.18 | 7.9 km |
Anaerobic Digestion · Operational | 3 | 9.8 km |
Advanced Conversion Technologies · Under Construction | 9.6 | 9.8 km |
Anaerobic Digestion · Operational | 2.3 | 10.8 km |
How big is Waltham Point Distribution Centre?
Waltham Point Distribution Centre has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Waltham Point Distribution Centre?
REPD records the operator as Sainsburys Supermarkets Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Waltham Point Distribution Centre approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 5 February 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6114.