Renewable sites › Waltham Point Distribution Centre
Waltham Point Distribution Centre
Waltham Point Distribution Centre is operational in Epping Forest with a recorded capacity of 1.8 MW, and has been generating since 2016-02-05.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2016-02-05 |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Epping Forest’s record on solar
Epping Forest has decided 9 solar farms and approved 89%, taking a median of 6.3 months. See every solar farm decision in Epping Forest →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lockfield Avenue Solar Solar Photovoltaics · Under Construction | 0.2 | 2.7 km |
Deephams Sewerage Treatment Works Anaerobic Digestion · Operational | 3 | 6.3 km |
Cattlegate Farm Biogas (Farm AD) Anaerobic Digestion · Operational | 1.5 | 7.3 km |
Edmonton EcoPark EfW EfW Incineration · Operational | 55 | 7.4 km |
Advent Way - Solar Panels Solar Photovoltaics · Operational | 0.18 | 7.9 km |
Ratty's Lane Sustainable Energy Facility (Waste AD) Anaerobic Digestion · Operational | 3 | 9.8 km |
Ratty's Lane Sustainable Energy Facility (ACT) Advanced Conversion Technologies · Under Construction | 9.6 | 9.8 km |
Rye Meads Sewerage Treatment Works Anaerobic Digestion · Operational | 2.3 | 10.8 km |
How big is Waltham Point Distribution Centre?
Waltham Point Distribution Centre has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Waltham Point Distribution Centre?
REPD records the operator as Sainsburys Supermarkets Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Waltham Point Distribution Centre approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-02-05.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6114.
Novarly Parcel · official public data, read properly · parcel.novarly.com