Waltham Point Distribution Centre is operational in Epping Forest with a recorded capacity of 1.8 MW, and has been generating since 2016-02-05.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-02-05
Solar Photovoltaics
Technology
Sainsburys Supermarkets Limited
Epping Forest
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2016-02-05

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Epping Forest’s record on solar

Epping Forest has decided 9 solar farms and approved 89%, taking a median of 6.3 months. See every solar farm decision in Epping Forest

Other built sites within 15 km

SiteMWDistance
Lockfield Avenue Solar
Solar Photovoltaics · Under Construction
0.22.7 km
Deephams Sewerage Treatment Works
Anaerobic Digestion · Operational
36.3 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.57.3 km
Edmonton EcoPark EfW
EfW Incineration · Operational
557.4 km
Advent Way - Solar Panels
Solar Photovoltaics · Operational
0.187.9 km
Ratty's Lane Sustainable Energy Facility (Waste AD)
Anaerobic Digestion · Operational
39.8 km
Ratty's Lane Sustainable Energy Facility (ACT)
Advanced Conversion Technologies · Under Construction
9.69.8 km
Rye Meads Sewerage Treatment Works
Anaerobic Digestion · Operational
2.310.8 km

How big is Waltham Point Distribution Centre?

Waltham Point Distribution Centre has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Waltham Point Distribution Centre?

REPD records the operator as Sainsburys Supermarkets Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Waltham Point Distribution Centre approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-02-05.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6114.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council