Advent Way - Solar Panels is operational in Enfield with a recorded capacity of 0.18 MW, and has been generating since 2021-12-01.
Planning and build timeline
| Application submitted | 2021-09-07 |
| Permission granted | 2021-11-01 2 months after submission |
| Operational | 2021-12-01 1 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Enfield’s record on solar
Enfield has decided 16 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Enfield →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Edmonton EcoPark EfW EfW Incineration · Operational | 55 | 0.6 km |
Deephams Sewerage Treatment Works Anaerobic Digestion · Operational | 3 | 1.6 km |
Lockfield Avenue Solar Solar Photovoltaics · Under Construction | 0.2 | 5.3 km |
Waltham Point Distribution Centre Solar Photovoltaics · Operational | 1.8 | 7.9 km |
Holly Street - Solar PV Panels Solar Photovoltaics · Operational | 0.16 | 8 km |
King's Yard Biomass (dedicated) · Operational | 3 | 8.9 km |
Bywaters� Materials Recovery Facility Solar Array Solar Photovoltaics · Operational | 1 | 10.4 km |
Cattlegate Farm Biogas (Farm AD) Anaerobic Digestion · Operational | 1.5 | 10.4 km |
How big is Advent Way - Solar Panels?
Advent Way - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Advent Way - Solar Panels?
REPD records the operator as Big Yellow Group Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Advent Way - Solar Panels approved and built?
The application was submitted on 2021-09-07. Permission was granted on 2021-11-01, 2 months later. The site became operational on 2021-12-01, 1 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9671.
Novarly Parcel · official public data, read properly · parcel.novarly.com