Renewable sitesAdvent Way - Solar Panels

Advent Way - Solar Panels

Advent Way - Solar Panels is operational in Enfield with a recorded capacity of 0.18 MW, and has been generating since 2021-12-01.

0.18 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-12-01
Solar Photovoltaics
Technology
Big Yellow Group Plc
Enfield
Authority
England

Planning and build timeline

Application submitted2021-09-07
Permission granted2021-11-01
2 months after submission
Operational2021-12-01
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Enfield’s record on solar

Enfield has decided 16 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Enfield

Other built sites within 15 km

SiteMWDistance
Edmonton EcoPark EfW
EfW Incineration · Operational
550.6 km
Deephams Sewerage Treatment Works
Anaerobic Digestion · Operational
31.6 km
Lockfield Avenue Solar
Solar Photovoltaics · Under Construction
0.25.3 km
Waltham Point Distribution Centre
Solar Photovoltaics · Operational
1.87.9 km
Holly Street - Solar PV Panels
Solar Photovoltaics · Operational
0.168 km
King's Yard
Biomass (dedicated) · Operational
38.9 km
Bywaters� Materials Recovery Facility Solar Array
Solar Photovoltaics · Operational
110.4 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.510.4 km

How big is Advent Way - Solar Panels?

Advent Way - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Advent Way - Solar Panels?

REPD records the operator as Big Yellow Group Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Advent Way - Solar Panels approved and built?

The application was submitted on 2021-09-07. Permission was granted on 2021-11-01, 2 months later. The site became operational on 2021-12-01, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9671.