Advent Way - Solar Panels is an operational 0.18 MW solar farm in Enfield, generating since 1 December 2021. Planning permission was granted on 1 November 2021, 2 months after submission. Operator of record: Big Yellow Group Plc.

0.18 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2021
Solar Photovoltaics
Technology
Big Yellow Group Plc
Enfield
Authority
England

Planning and build timeline

Application submitted7 September 2021
Permission granted1 November 2021
2 months after submission
Operational1 December 2021
1 months after consent

Screening a site of your own?

RedlineUK · £39

Enfield approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Advent Way - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Enfield’s record on solar

Enfield has decided 16 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Enfield

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
550.6 km
Anaerobic Digestion · Operational
31.6 km
Solar Photovoltaics · Under Construction
0.25.3 km
Solar Photovoltaics · Operational
1.87.9 km
Solar Photovoltaics · Operational
0.168 km
Biomass (dedicated) · Operational
38.9 km
Solar Photovoltaics · Operational
110.4 km
Anaerobic Digestion · Operational
1.510.4 km

How big is Advent Way - Solar Panels?

Advent Way - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Advent Way - Solar Panels?

REPD records the operator as Big Yellow Group Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Advent Way - Solar Panels approved and built?

The application was submitted on 7 September 2021. Permission was granted on 1 November 2021, 2 months later. The site became operational on 1 December 2021, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9671.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode