Ratty's Lane Sustainable Energy Facility (ACT) is a 9.6 MW advanced conversion plant under construction in Broxbourne. Planning permission was granted on 26 March 2012, 21 months after submission. Operator of record: AssestGen Partner / Hoddesdon Energy.

9.6 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
AssestGen Partner / Hoddesdon Energy
Broxbourne
Authority
England

Planning and build timeline

Application submitted28 June 2010
Permission granted26 March 2012
21 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Broxbourne: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ratty's Lane Sustainable Energy Facility (ACT)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
30 km
Anaerobic Digestion · Operational
2.31.4 km
Landfill Gas · Operational
3.96.7 km
Landfill Gas · Operational
2.67.3 km
Solar Photovoltaics · Operational
1.89.8 km
Anaerobic Digestion · Operational
1.210.8 km
Anaerobic Digestion · Operational
1.511.1 km
Solar Photovoltaics · Under Construction
0.212.3 km

How big is Ratty's Lane Sustainable Energy Facility (ACT)?

Ratty's Lane Sustainable Energy Facility (ACT) has a recorded installed capacity of 9.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ratty's Lane Sustainable Energy Facility (ACT)?

REPD records the operator as AssestGen Partner / Hoddesdon Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ratty's Lane Sustainable Energy Facility (ACT) approved and built?

The application was submitted on 28 June 2010. Permission was granted on 26 March 2012, 21 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 908.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode