Deephams Sewerage Treatment Works is operational in Enfield with a recorded capacity of 3 MW, and has been generating since 2016-10-18.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-10-18
Anaerobic Digestion
Technology
Thames Water Utilities
Enfield
Authority
England

Planning and build timeline

Application submitted2014-07-07
Permission granted2015-02-20
7 months after submission
Operational2016-10-18
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Edmonton EcoPark EfW
EfW Incineration · Operational
551.1 km
Advent Way - Solar Panels
Solar Photovoltaics · Operational
0.181.6 km
Lockfield Avenue Solar
Solar Photovoltaics · Under Construction
0.23.7 km
Waltham Point Distribution Centre
Solar Photovoltaics · Operational
1.86.3 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.59.1 km
Holly Street - Solar PV Panels
Solar Photovoltaics · Operational
0.169.6 km
King's Yard
Biomass (dedicated) · Operational
310.4 km
Bywaters� Materials Recovery Facility Solar Array
Solar Photovoltaics · Operational
111.9 km

How big is Deephams Sewerage Treatment Works?

Deephams Sewerage Treatment Works has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Deephams Sewerage Treatment Works?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Deephams Sewerage Treatment Works approved and built?

The application was submitted on 2014-07-07. Permission was granted on 2015-02-20, 7 months later. The site became operational on 2016-10-18, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6491.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council