Renewable sites › Lockfield Avenue Solar
Lockfield Avenue Solar
Lockfield Avenue Solar is under construction in Enfield with a recorded capacity of 0.2 MW.
Planning and build timeline
| Application submitted | 2020-10-13 |
| Permission granted | 2020-12-23 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Enfield’s record on solar
Enfield has decided 16 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Enfield →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Waltham Point Distribution Centre Solar Photovoltaics · Operational | 1.8 | 2.7 km |
Deephams Sewerage Treatment Works Anaerobic Digestion · Operational | 3 | 3.7 km |
Edmonton EcoPark EfW EfW Incineration · Operational | 55 | 4.8 km |
Advent Way - Solar Panels Solar Photovoltaics · Operational | 0.18 | 5.3 km |
Cattlegate Farm Biogas (Farm AD) Anaerobic Digestion · Operational | 1.5 | 7.1 km |
Ratty's Lane Sustainable Energy Facility (ACT) Advanced Conversion Technologies · Under Construction | 9.6 | 12.3 km |
Ratty's Lane Sustainable Energy Facility (Waste AD) Anaerobic Digestion · Operational | 3 | 12.3 km |
Holly Street - Solar PV Panels Solar Photovoltaics · Operational | 0.16 | 13.2 km |
How big is Lockfield Avenue Solar?
Lockfield Avenue Solar has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lockfield Avenue Solar?
REPD records the operator as Byron & Byron Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lockfield Avenue Solar approved and built?
The application was submitted on 2020-10-13. Permission was granted on 2020-12-23, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8234.