Novarly ParcelRenewable sites

Renewable sitesLockfield Avenue Solar

Lockfield Avenue Solar

Lockfield Avenue Solar is a 0.2 MW solar farm under construction in Enfield. Planning permission was granted on 23 December 2020, 2 months after submission. Operator of record: Byron & Byron Limited.

0.2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Byron & Byron Limited
Enfield
Authority
England

Planning and build timeline

Application submitted13 October 2020
Permission granted23 December 2020
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Enfield approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lockfield Avenue Solar’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Enfield’s record on solar

Enfield has decided 16 solar farms and approved 94%, taking a median of 1.8 months. See every solar farm decision in Enfield

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.82.7 km
Anaerobic Digestion · Operational
33.7 km
EfW Incineration · Operational
554.8 km
Solar Photovoltaics · Operational
0.185.3 km
Anaerobic Digestion · Operational
1.57.1 km
Anaerobic Digestion · Operational
312.3 km
Advanced Conversion Technologies · Under Construction
9.612.3 km
Solar Photovoltaics · Operational
0.1613.2 km

How big is Lockfield Avenue Solar?

Lockfield Avenue Solar has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lockfield Avenue Solar?

REPD records the operator as Byron & Byron Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lockfield Avenue Solar approved and built?

The application was submitted on 13 October 2020. Permission was granted on 23 December 2020, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8234.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode