Rye Meads Sewerage Treatment Works

Rye Meads Sewerage Treatment Works is operational in East Hertfordshire with a recorded capacity of 2.3 MW, and has been generating since 2015-07-01.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-07-01
Anaerobic Digestion
Technology
Thames Water Utilities
East Hertfordshire
Authority
England

Planning and build timeline

Application submitted2014-05-13
Permission grantednot recorded
Operational2015-07-01

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Ratty's Lane Sustainable Energy Facility (Waste AD)
Anaerobic Digestion · Operational
31.4 km
Ratty's Lane Sustainable Energy Facility (ACT)
Advanced Conversion Technologies · Under Construction
9.61.4 km
Brazier Landfill Scheme
Landfill Gas · Operational
3.96.8 km
Westmill Qaurry
Landfill Gas · Operational
2.67.4 km
The Nurseries, Green Tye
Anaerobic Digestion · Operational
1.29.4 km
Waltham Point Distribution Centre
Solar Photovoltaics · Operational
1.810.8 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.512.5 km
Lockfield Avenue Solar
Solar Photovoltaics · Under Construction
0.213.3 km

How big is Rye Meads Sewerage Treatment Works?

Rye Meads Sewerage Treatment Works has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rye Meads Sewerage Treatment Works?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rye Meads Sewerage Treatment Works approved and built?

The application was submitted on 2014-05-13. REPD does not record a grant date. The site became operational on 2015-07-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6490.