Rye Meads Sewerage Treatment Works
Rye Meads Sewerage Treatment Works is operational in East Hertfordshire with a recorded capacity of 2.3 MW, and has been generating since 2015-07-01.
Planning and build timeline
| Application submitted | 2014-05-13 |
| Permission granted | not recorded |
| Operational | 2015-07-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — East Hertfordshire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ratty's Lane Sustainable Energy Facility (Waste AD) Anaerobic Digestion · Operational | 3 | 1.4 km |
Ratty's Lane Sustainable Energy Facility (ACT) Advanced Conversion Technologies · Under Construction | 9.6 | 1.4 km |
Brazier Landfill Scheme Landfill Gas · Operational | 3.9 | 6.8 km |
Westmill Qaurry Landfill Gas · Operational | 2.6 | 7.4 km |
The Nurseries, Green Tye Anaerobic Digestion · Operational | 1.2 | 9.4 km |
Waltham Point Distribution Centre Solar Photovoltaics · Operational | 1.8 | 10.8 km |
Cattlegate Farm Biogas (Farm AD) Anaerobic Digestion · Operational | 1.5 | 12.5 km |
Lockfield Avenue Solar Solar Photovoltaics · Under Construction | 0.2 | 13.3 km |
How big is Rye Meads Sewerage Treatment Works?
Rye Meads Sewerage Treatment Works has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rye Meads Sewerage Treatment Works?
REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rye Meads Sewerage Treatment Works approved and built?
The application was submitted on 2014-05-13. REPD does not record a grant date. The site became operational on 2015-07-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6490.