Renewable sitesEdmonton EcoPark EfW

Edmonton EcoPark EfW

Edmonton EcoPark EfW is an operational 55 MW energy-from-waste plant in England, generating since 1 January 1974. REPD does not record the planning grant date. Operator of record: Londonwaste.

55 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 1974
EfW Incineration
Technology
Londonwaste
National
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 January 1974

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Edmonton EcoPark EfW’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.180.6 km
Anaerobic Digestion · Operational
31.1 km
Solar Photovoltaics · Under Construction
0.24.8 km
Solar Photovoltaics · Operational
1.87.4 km
Solar Photovoltaics · Operational
0.168.5 km
Biomass (dedicated) · Operational
39.3 km
Anaerobic Digestion · Operational
1.510.1 km
Solar Photovoltaics · Operational
110.7 km

How big is Edmonton EcoPark EfW?

Edmonton EcoPark EfW has a recorded installed capacity of 55 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Edmonton EcoPark EfW?

REPD records the operator as Londonwaste. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Edmonton EcoPark EfW approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 January 1974.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4924.

Novarly Parcel · official public data, read properly · parcel.novarly.com