Novarly ParcelRenewable sites

Renewable sitesEdmonton EcoPark EfW

Edmonton EcoPark EfW

Edmonton EcoPark EfW is operational in England with a recorded capacity of 55 MW, and has been generating since 1974-01-01.

55 MW
Capacity
as recorded in REPD
Operational
Status
since 1974-01-01
EfW Incineration
Technology
Londonwaste
National
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1974-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Advent Way - Solar Panels
Solar Photovoltaics · Operational
0.180.6 km
Deephams Sewerage Treatment Works
Anaerobic Digestion · Operational
31.1 km
Lockfield Avenue Solar
Solar Photovoltaics · Under Construction
0.24.8 km
Waltham Point Distribution Centre
Solar Photovoltaics · Operational
1.87.4 km
Holly Street - Solar PV Panels
Solar Photovoltaics · Operational
0.168.5 km
King's Yard
Biomass (dedicated) · Operational
39.3 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.510.1 km
Bywaters� Materials Recovery Facility Solar Array
Solar Photovoltaics · Operational
110.7 km

How big is Edmonton EcoPark EfW?

Edmonton EcoPark EfW has a recorded installed capacity of 55 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Edmonton EcoPark EfW?

REPD records the operator as Londonwaste. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Edmonton EcoPark EfW approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1974-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4924.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council