Renewable sites › Ratty's Lane Sustainable Energy Facility (Waste AD)
Ratty's Lane Sustainable Energy Facility (Waste AD)
Ratty's Lane Sustainable Energy Facility (Waste AD) is operational in Broxbourne with a recorded capacity of 3 MW, and has been generating since 2016-07-04.
Planning and build timeline
| Application submitted | 2010-06-28 |
| Permission granted | 2012-03-26 21 months after submission |
| Operational | 2016-07-04 51 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ratty's Lane Sustainable Energy Facility (ACT) Advanced Conversion Technologies · Under Construction | 9.6 | 0 km |
Rye Meads Sewerage Treatment Works Anaerobic Digestion · Operational | 2.3 | 1.4 km |
Brazier Landfill Scheme Landfill Gas · Operational | 3.9 | 6.7 km |
Westmill Qaurry Landfill Gas · Operational | 2.6 | 7.3 km |
Waltham Point Distribution Centre Solar Photovoltaics · Operational | 1.8 | 9.8 km |
The Nurseries, Green Tye Anaerobic Digestion · Operational | 1.2 | 10.8 km |
Cattlegate Farm Biogas (Farm AD) Anaerobic Digestion · Operational | 1.5 | 11.1 km |
Lockfield Avenue Solar Solar Photovoltaics · Under Construction | 0.2 | 12.3 km |
How big is Ratty's Lane Sustainable Energy Facility (Waste AD)?
Ratty's Lane Sustainable Energy Facility (Waste AD) has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ratty's Lane Sustainable Energy Facility (Waste AD)?
REPD records the operator as Biogen (formerly Tamar Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ratty's Lane Sustainable Energy Facility (Waste AD) approved and built?
The application was submitted on 2010-06-28. Permission was granted on 2012-03-26, 21 months later. The site became operational on 2016-07-04, 51 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 311.
Novarly Parcel · official public data, read properly · parcel.novarly.com