Novarly ParcelRenewable sites

Renewable sitesVale Of Mowbray Limited - Solar Photovoltaic System

Vale Of Mowbray Limited - Solar Photovoltaic System

Vale Of Mowbray Limited - Solar Photovoltaic System is under construction in North Yorkshire with a recorded capacity of 1 MW.

1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Vale of Mowbray Limited
North Yorkshire
Authority
England

Planning and build timeline

Application submitted2021-06-08
Permission granted2022-06-16
12 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Yorkshire’s record on solar

North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire

Other built sites within 15 km

SiteMWDistance
Leeming Bar (Waste AD)
Anaerobic Digestion · Operational
1.52 km
North East of Ainderby Steeple
Solar Photovoltaics · Operational
5.95.1 km
Land East of Appleton Farm
Solar Photovoltaics · Operational
57.6 km
Heck Food, Lime Lane - Solar Panels
Solar Photovoltaics · Operational
0.2410.6 km
Scorton
Landfill Gas · Operational
110.8 km
Land North of Sandhutton Lane
Solar Photovoltaics · Operational
513 km
Darlington Road, Skeeby
Solar Photovoltaics · Operational
5514.8 km

How big is Vale Of Mowbray Limited - Solar Photovoltaic System?

Vale Of Mowbray Limited - Solar Photovoltaic System has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Vale Of Mowbray Limited - Solar Photovoltaic System?

REPD records the operator as Vale of Mowbray Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Vale Of Mowbray Limited - Solar Photovoltaic System approved and built?

The application was submitted on 2021-06-08. Permission was granted on 2022-06-16, 12 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9164.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council