Renewable sites › Vale Of Mowbray Limited - Solar Photovoltaic System
Vale Of Mowbray Limited - Solar Photovoltaic System
Vale Of Mowbray Limited - Solar Photovoltaic System is under construction in North Yorkshire with a recorded capacity of 1 MW.
Planning and build timeline
| Application submitted | 2021-06-08 |
| Permission granted | 2022-06-16 12 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on solar
North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Leeming Bar (Waste AD) Anaerobic Digestion · Operational | 1.5 | 2 km |
North East of Ainderby Steeple Solar Photovoltaics · Operational | 5.9 | 5.1 km |
Land East of Appleton Farm Solar Photovoltaics · Operational | 5 | 7.6 km |
Heck Food, Lime Lane - Solar Panels Solar Photovoltaics · Operational | 0.24 | 10.6 km |
Scorton Landfill Gas · Operational | 1 | 10.8 km |
Land North of Sandhutton Lane Solar Photovoltaics · Operational | 5 | 13 km |
Darlington Road, Skeeby Solar Photovoltaics · Operational | 55 | 14.8 km |
How big is Vale Of Mowbray Limited - Solar Photovoltaic System?
Vale Of Mowbray Limited - Solar Photovoltaic System has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Vale Of Mowbray Limited - Solar Photovoltaic System?
REPD records the operator as Vale of Mowbray Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Vale Of Mowbray Limited - Solar Photovoltaic System approved and built?
The application was submitted on 2021-06-08. Permission was granted on 2022-06-16, 12 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9164.
Novarly Parcel · official public data, read properly · parcel.novarly.com