Vale Of Mowbray Limited - Solar Photovoltaic System is a 1 MW solar farm under construction in North Yorkshire. Planning permission was granted on 16 June 2022, 12 months after submission. Operator of record: Vale of Mowbray Limited.
Planning and build timeline
| Application submitted | 8 June 2021 |
| Permission granted | 16 June 2022 12 months after submission |
| Operational | not recorded |
Screening a site of your own?
North Yorkshire approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Vale Of Mowbray Limited - Solar Photovoltaic System’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Yorkshire’s record on solar
North Yorkshire has decided 105 solar farms and approved 96%, taking a median of 2.7 months. See every solar farm decision in North Yorkshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.5 | 2 km |
Solar Photovoltaics · Operational | 5.9 | 5.1 km |
Solar Photovoltaics · Operational | 5 | 7.6 km |
Solar Photovoltaics · Operational | 0.24 | 10.6 km |
Landfill Gas · Operational | 1 | 10.8 km |
Solar Photovoltaics · Operational | 5 | 13 km |
Solar Photovoltaics · Operational | 55 | 14.8 km |
How big is Vale Of Mowbray Limited - Solar Photovoltaic System?
Vale Of Mowbray Limited - Solar Photovoltaic System has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Vale Of Mowbray Limited - Solar Photovoltaic System?
REPD records the operator as Vale of Mowbray Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Vale Of Mowbray Limited - Solar Photovoltaic System approved and built?
The application was submitted on 8 June 2021. Permission was granted on 16 June 2022, 12 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9164.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode