Renewable sites › Leeming Bar (Waste AD)
Leeming Bar (Waste AD)
Leeming Bar (Waste AD) is an operational 1.5 MW anaerobic digestion plant in North Yorkshire, generating since 15 January 2016. Planning permission was granted on 2 April 2015, 20 months after submission. Operator of record: JFS Biogas.
Planning and build timeline
| Application submitted | 30 July 2013 |
| Permission granted | 2 April 2015 20 months after submission |
| Operational | 15 January 2016 9 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in North Yorkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Leeming Bar (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 1 | 2 km |
Solar Photovoltaics · Operational | 5.9 | 5.1 km |
Solar Photovoltaics · Operational | 0.24 | 8.6 km |
Solar Photovoltaics · Operational | 5 | 9.6 km |
Solar Photovoltaics · Operational | 5 | 11.2 km |
Landfill Gas · Operational | 1 | 12.8 km |
Solar Photovoltaics · Operational | 5 | 13.3 km |
How big is Leeming Bar (Waste AD)?
Leeming Bar (Waste AD) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Leeming Bar (Waste AD)?
REPD records the operator as JFS Biogas. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Leeming Bar (Waste AD) approved and built?
The application was submitted on 30 July 2013. Permission was granted on 2 April 2015, 20 months later. The site became operational on 15 January 2016, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 330.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode