Novarly ParcelRenewable sites

Renewable sitesScorton

Scorton

Scorton is an operational 1 MW landfill gas site in North Yorkshire, generating since 1 November 2003. Planning permission was granted on 25 October 2001, 2 months after submission. Operator of record: Yorwaste.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2003
Landfill Gas
Technology
Yorwaste
North Yorkshire
Authority
England

Planning and build timeline

Application submitted30 August 2001
Permission granted25 October 2001
2 months after submission
Operational1 November 2003
24 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Yorkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Scorton’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
55.1 km
Solar Photovoltaics · Operational
556 km
Solar Photovoltaics · Operational
56.2 km
Battery · Under Construction
356.8 km
Solar Photovoltaics · Under Construction
110.8 km
Solar Photovoltaics · Operational
5.911.5 km
Anaerobic Digestion · Operational
1.512.8 km
Solar Photovoltaics · Operational
514.4 km

How big is Scorton?

Scorton has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Scorton?

REPD records the operator as Yorwaste. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Scorton approved and built?

The application was submitted on 30 August 2001. Permission was granted on 25 October 2001, 2 months later. The site became operational on 1 November 2003, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 803.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode